ITAC Assessment: LS2403
ITAC logo
ITAC Assessment: LS2403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fabricated Structural Metal
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area 300,000
ft2
Annual Production 16,640
ton
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,243 2,460,518
kWh
Electricity Demand $70,540 9,405
kW-mo/yr
TOTAL YEARLY COSTS $310,783
RECOMMENDED SAVINGS* $12,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,116 $25 $4,116
41,995
kWh
-
02 2.7261: Install timers and/or thermostats $1,928 $25 $1,928
19,675
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,306 $3,600 $4,623
47,174
kWh
$683
-
kW-mo/yr
04 2.4238: Do not use compressed air for personal cooling $1,205 $950 $1,205
12,292
kWh
-
TOTAL RECOMMENDED $12,555 $4,600 $11,872
121,136
kWh
$683
-
kW-mo/yr
TOTAL IMPLEMENTED $8,439 $4,575 $7,756
79,141
kWh
$683
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs