Assessment Year | 2019 |
---|---|
Principal Product | Weight Loss Food Mixes |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 86,039
pieces
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,273 | 1,294,352 |
kWh
|
$0.13 |
TOTAL YEARLY COSTS | $163,273 | |||
RECOMMENDED SAVINGS* | $76,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,160 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $11,220 | $2,763 |
$11,220
89,051
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,062 | $3,500 |
$8,062
63,984
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,531 | $8,066 |
$14,531
115,326
kWh
|
|
04 | 2.6218: Turn off equipment when not in use | $479 | $463 |
$479
3,802
kWh
|
|
05 | 2.7224: Reduce space conditioning during non-working hours | $1,746 | $1,755 |
$1,746
13,860
kWh
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,093 | $2,092 |
$1,093
8,673
kWh
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,081 | $2,100 |
$1,081
8,647
kWh
|
|
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,041 | $3,500 |
$1,041
8,260
kWh
|
|
09 | 2.9114: Use solar heat to make electricty | $37,647 | $154,353 |
$37,647
298,447
kWh
|
|
TOTAL RECOMMENDED | $76,900 | $178,591 |
$76,900
610,050
kWh
|
||
TOTAL IMPLEMENTED | $38,160 | $22,147 |
$38,160
302,930
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs