ITAC Assessment: LS2317
ITAC logo
ITAC Assessment: LS2317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chemical
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 7
Plant Area 110,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,491 1,632,500
kWh
Electricity Demand $15,359 3,924
kW-mo/yr
TOTAL YEARLY COSTS $158,850
RECOMMENDED SAVINGS* $1,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $344 $45 $344
3,909
kWh
-
02 2.7261: Install timers and/or thermostats $223 $50 $223
2,575
kWh
-
03 2.7135: Install occupancy sensors $207 $175 $207
2,346
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $511 $476 $452
5,137
kWh
$59
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $535 $4,530 $535
6,078
kWh
-
TOTAL RECOMMENDED $1,820 $5,276 $1,761
20,045
kWh
$59
-
kW-mo/yr
TOTAL IMPLEMENTED $1,820 $5,276 $1,761
20,045
kWh
$59
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs