ITAC Assessment: LS2219
ITAC logo
ITAC Assessment: LS2219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Pepper Sauce
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 329,000
ft2
Annual Production 14,000,000
units
Production Hrs. Annual 5,720
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,330 3,703,000
kWh
Electricity Demand $39,510 9,588
kW-mo/yr
TOTAL YEARLY COSTS $314,840
RECOMMENDED SAVINGS* $37,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 4.642: Install sensors to detect and avoid jams $35,000 $7,400 - - $35,000
02 2.7261: Install timers and/or thermostats $679 $150 $679
9,176
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $389 $225 $389
5,259
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $676 $1,121 $556
7,518
kWh
$120
-
kW-mo/yr
-
05 2.7134: Use photocell controls $281 $740 $281
3,784
kWh
- -
TOTAL RECOMMENDED $37,025 $9,636 $1,905
25,737
kWh
$120
-
kW-mo/yr
$35,000
TOTAL IMPLEMENTED $1,065 $1,346 $945
12,777
kWh
$120
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs