ITAC Assessment: LS2216
ITAC logo
ITAC Assessment: LS2216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 31
Plant Area 146,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,394,308 17,487,750
kWh
TOTAL YEARLY COSTS $1,394,308
RECOMMENDED SAVINGS* $257,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $1,899 $150 $1,899
23,814
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,917 $450 $2,917
36,581
kWh
-
03 2.7134: Use photocell controls $251 $74 $251
3,153
kWh
-
04 2.7135: Install occupancy sensors $1,095 $350 $1,095
13,735
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $48,044 $18,502 $48,044
602,577
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $42 $50 $42
530
kWh
-
07 3.1291: Eliminate practice of mixing waste streams $50,000 $64,300 - $50,000
08 3.6112: Use filter and drying oven to reduce sludge volume $49,168 $91,825 - $49,168
09 3.3131: Use evaporation to concentrate material $104,200 $500,000 - $104,200
TOTAL RECOMMENDED $257,616 $675,701 $54,248
680,390
kWh
$203,368
TOTAL IMPLEMENTED $49,390 $18,926 $49,390
619,465
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs