Assessment Year | 2022 |
---|---|
Principal Product | Resins |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 31 |
Plant Area |
146,000
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,394,308 | 17,487,750 |
kWh
|
$0.080 |
TOTAL YEARLY COSTS | $1,394,308 | |||
RECOMMENDED SAVINGS* | $257,616 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,390 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,899 | $150 |
$1,899
23,814
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,917 | $450 |
$2,917
36,581
kWh
|
- | |
03 | 2.7134: Use photocell controls | $251 | $74 |
$251
3,153
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $1,095 | $350 |
$1,095
13,735
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,044 | $18,502 |
$48,044
602,577
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $42 | $50 |
$42
530
kWh
|
- | |
07 | 3.1291: Eliminate practice of mixing waste streams | $50,000 | $64,300 | - | $50,000 | |
08 | 3.6112: Use filter and drying oven to reduce sludge volume | $49,168 | $91,825 | - | $49,168 | |
09 | 3.3131: Use evaporation to concentrate material | $104,200 | $500,000 | - | $104,200 | |
TOTAL RECOMMENDED | $257,616 | $675,701 |
$54,248
680,390
kWh
|
$203,368 | ||
TOTAL IMPLEMENTED | $49,390 | $18,926 |
$49,390
619,465
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs