ITAC Assessment: LS2215
ITAC logo
ITAC Assessment: LS2215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 68,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 5,720
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,542 3,220,411
kWh
Electricity Demand $68,163 6,412
kW-mo/yr
Natural Gas $118,097 24,088
MMBtu
Waste Disposal Costs
Water Usage $52,921 2,289
Tgal
TOTAL YEARLY COSTS $467,723
RECOMMENDED SAVINGS* $190,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $184,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 4.661: Level zero – install control systems for existing equipment $50,000 - - - $50,000
02 4.132: Purchase new equipment to reduce material use / cost $9,603 $1,118 $(-322.0)
(-4,533)
kWh
- $9,925
03 4.642: Install sensors to detect and avoid jams $72,450 $2,400 - - $72,450
04 2.7261: Install timers and/or thermostats $631 $75 $631
8,890
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,461 $270 $1,461
20,580
kWh
- -
06 2.7135: Install occupancy sensors $247 $100 $247
3,447
kWh
- -
07 4.662: Level one – add communication using iiot devices to existing control system to modify operations $49,680 $58,020 - - $49,680
08 2.2414: Use waste heat from hot flue gases to preheat $6,502 $14,000 - $6,502
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $188 $415 $188
2,652
kWh
- -
TOTAL RECOMMENDED $190,762 $76,398 $2,205
31,036
kWh
$6,502
-
MMBtu
$182,055
TOTAL IMPLEMENTED $184,072 $61,983 $2,017
28,384
kWh
- $182,055
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs