ITAC Assessment: SD0585
ITAC logo
ITAC Assessment: SD0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 115,100
ft2
Annual Production 285,000
bbl
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $602,591 5,428,387
kWh
Electricity Demand $562,070 13,773
kW-mo/yr
Electricity Fees $(-15,519.0) -
Natural Gas $108,934 42,167
MMBtu
TOTAL YEARLY COSTS $1,258,076
RECOMMENDED SAVINGS* $32,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,655

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,052 $8,453 $5,582
50,282
kWh
$3,290
-
kW-mo/yr
- $180
02 2.2441: Preheat boiler makeup water with waste process heat $11,628 $12,000 - - $11,628
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $2,603 $200 $2,603
23,447
kWh
- - -
04 2.7134: Use photocell controls $2,188 $3,520 $2,188
19,715
kWh
- - -
05 2.4323: Use optimum size and capacity equipment $6,928 $14,000 $2,030
18,203
kWh
$4,898
-
kW-mo/yr
- -
TOTAL RECOMMENDED $32,399 $38,173 $12,403
111,647
kWh
$8,188
-
kW-mo/yr
$11,628
-
MMBtu
$180
TOTAL IMPLEMENTED $11,655 $8,653 $8,185
73,729
kWh
$3,290
-
kW-mo/yr
- $180
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs