ITAC Assessment: LS2112
ITAC logo
ITAC Assessment: LS2112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Processed Catfish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area 100,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,888 9,301,418
kWh
Electricity Demand $98,368 23,876
kW-mo/yr
TOTAL YEARLY COSTS $683,256
RECOMMENDED SAVINGS* $20,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $289 $38 $289
4,580
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $2,132 $300 $2,132
33,844
kWh
-
03 2.7134: Use photocell controls $662 $111 $662
10,512
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,586 $540 $2,586
41,045
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,304 $8,316 $12,644
200,703
kWh
$1,660
-
kW-mo/yr
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $285 $445 $285
4,531
kWh
-
TOTAL RECOMMENDED $20,258 $9,750 $18,598
295,215
kWh
$1,660
-
kW-mo/yr
TOTAL IMPLEMENTED $19,022 $9,156 $17,362
275,592
kWh
$1,660
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs