Assessment Year | 2009 |
---|---|
Principal Product | Screen printed items |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
205,000
ft2
|
Annual Production | 11,000,000
pieces
|
Production Hrs. Annual | 2,159
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,200 | 1,987,536 |
kWh
|
$0.097 |
Electricity Demand | $65,980 | 8,796 |
kW-mo/yr
|
$7.50 |
Electricity Fees | $2,396 | - |
|
- |
Natural Gas | $42,204 | 4,494 |
MMBtu
|
$9.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,542 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.513: Re-arrange equipment layout to reduce labor costs | $13,545 | $38,430 |
$8,455
94,030
kWh
|
$3,090
-
kW-mo/yr
|
- | $2,000 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,920 | $680 |
$3,600
40,120
kWh
|
$1,320
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $3,200 | $11,050 | - |
$3,200
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,440 | $15 |
$1,050
11,700
kWh
|
$390
-
kW-mo/yr
|
- | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $705 | $300 |
$580
6,450
kWh
|
$125
-
kW-mo/yr
|
- | - | |
06 | 4.821: Pay bills on time to avoid late fees | $452 | - | - | - | - | $452 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,025 | $535 |
$265
2,940
kWh
|
$25
-
kW-mo/yr
|
$735 | - | |
TOTAL RECOMMENDED | $25,287 | $51,010 |
$13,950
155,240
kWh
|
$8,150
-
kW-mo/yr
|
$735 | $2,452 | ||
TOTAL IMPLEMENTED | $8,542 | $1,530 |
$5,495
61,210
kWh
|
$1,860
-
kW-mo/yr
|
$735 | $452 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs