ITAC Assessment: LS2008
ITAC logo
ITAC Assessment: LS2008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Alloy Metals
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 60
Plant Area 142,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 3,770
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,111 1,235,592
kWh
Electricity Demand $21,197 10,037
kW-mo/yr
TOTAL YEARLY COSTS $104,308
RECOMMENDED SAVINGS* $18,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $255 $25 $255
3,791
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,491 $1,125 $6,491
96,506
kWh
-
03 2.7135: Install occupancy sensors $188 $50 $188
2,796
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,024 $8,534 $10,003
148,711
kWh
$1,021
-
kW-mo/yr
05 2.7444: Close holes and openings in building such as broken windows $89 $110 $89
1,329
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $327 $412 $327
4,864
kWh
-
TOTAL RECOMMENDED $18,374 $10,256 $17,353
257,997
kWh
$1,021
-
kW-mo/yr
TOTAL IMPLEMENTED $18,097 $10,096 $17,076
253,872
kWh
$1,021
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs