| Assessment Year | 2021 |
|---|---|
| Principal Product | Alloy Metals |
| NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | less than $500 k |
| # of Employees | 60 |
| Plant Area |
142,000
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 3,770
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $83,111 | 1,235,592 |
kWh
|
$0.067 |
| Electricity Demand | $21,197 | 10,037 |
kW-mo/yr
|
$2.11 |
| TOTAL YEARLY COSTS | $104,308 | |||
| RECOMMENDED SAVINGS* | $18,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,097 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $255 | $25 |
$255
3,791
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,491 | $1,125 |
$6,491
96,506
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $188 | $50 |
$188
2,796
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,024 | $8,534 |
$10,003
148,711
kWh
|
$1,021
-
kW-mo/yr
|
|
| 05 | 2.7444: Close holes and openings in building such as broken windows | $89 | $110 |
$89
1,329
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $327 | $412 |
$327
4,864
kWh
|
- | |
| TOTAL RECOMMENDED | $18,374 | $10,256 |
$17,353
257,997
kWh
|
$1,021
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $18,097 | $10,096 |
$17,076
253,872
kWh
|
$1,021
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs