ITAC Assessment: LS2001
ITAC logo
ITAC Assessment: LS2001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater/Sewage Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 21
Plant Area 780,000
ft2
Annual Production 5,475,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,344 9,996,000
kWh
Electricity Demand $98,880 24,000
kW-mo/yr
Natural Gas $44,864 7,187
MMBtu
TOTAL YEARLY COSTS $707,088
RECOMMENDED SAVINGS* $205,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $1,297 $6 $1,297
23,020
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,814 $6,317 $23,373
414,736
kWh
$2,441
-
kW-mo/yr
03 2.7124: Make a practice of turning off lights when not needed $1,753 $500 $1,753
31,098
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $458 $158 $458
8,130
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $89,345 $41,575 $81,212
1,441,020
kWh
$8,133
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $86,774 $49,800 $86,774
1,539,727
kWh
-
07 2.7135: Install occupancy sensors $23 $25 $23
400
kWh
-
TOTAL RECOMMENDED $205,464 $98,381 $194,890
3,458,131
kWh
$10,574
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs