Assessment Year | 2019 |
---|---|
Principal Product | Pressure Vessels |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
46,380
ft2
|
Annual Production | 2,400,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,778 | 418,181 |
kWh
|
$0.11 |
Fuel Oil #2 | $20,000 | 4,000 |
MMBtu
|
$5.00 |
Other Gas | $38,400 | 7,680 |
MMBtu
|
$5.00 |
TOTAL YEARLY COSTS | $105,178 | |||
RECOMMENDED SAVINGS* | $14,293 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $2,175 | $50 |
$2,175
19,442
kWh
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $402 | $25 |
$402
3,590
kWh
|
|
03 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $3,051 | $270 |
$3,051
27,279
kWh
|
|
04 | 2.7135: Install occupancy sensors | $989 | $225 |
$989
8,845
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,611 | $8,430 |
$7,611
68,042
kWh
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $65 | $193 |
$65
586
kWh
|
|
TOTAL RECOMMENDED | $14,293 | $9,193 |
$14,293
127,784
kWh
|
||
TOTAL IMPLEMENTED | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs