ITAC Assessment: LS1913
ITAC logo
ITAC Assessment: LS1913
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Pressure Vessels
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 46,380
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,778 418,181
kWh
Fuel Oil #2 $20,000 4,000
MMBtu
Other Gas $38,400 7,680
MMBtu
TOTAL YEARLY COSTS $105,178
RECOMMENDED SAVINGS* $14,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $2,175 $50 $2,175
19,442
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $402 $25 $402
3,590
kWh
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,051 $270 $3,051
27,279
kWh
04 2.7135: Install occupancy sensors $989 $225 $989
8,845
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,611 $8,430 $7,611
68,042
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $65 $193 $65
586
kWh
TOTAL RECOMMENDED $14,293 $9,193 $14,293
127,784
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs