ITAC Assessment: LS1911
ITAC logo
ITAC Assessment: LS1911
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wastewater/Sewage Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 15
Plant Area 4,356,000
ft2
Annual Production 3,650,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $418,384 6,255,200
kWh
Natural Gas $56,668 5,437
MMBtu
TOTAL YEARLY COSTS $475,052
RECOMMENDED SAVINGS* $71,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $651 $25 $651
9,729
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,381 $174 $2,381
35,592
kWh
03 2.7135: Install occupancy sensors $1,929 $325 $1,929
28,843
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,832 $1,736 $6,832
102,142
kWh
05 2.7124: Make a practice of turning off lights when not needed $1,758 $500 $1,758
26,280
kWh
06 2.4322: Use or replace with energy efficient substitutes $40,165 $22,200 $40,165
600,498
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,502 $12,000 $17,502
261,675
kWh
TOTAL RECOMMENDED $71,218 $36,960 $71,218
1,064,759
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs