| Assessment Year | 2019 |
|---|---|
| Principal Product | Steel Sheet Metal Parts |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
40,000
ft2
|
| Annual Production | 10,000
ton
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $21,359 | 184,440 |
kWh
|
$0.12 |
| Natural Gas | $20,000 | 4,000 |
MMBtu
|
$5.00 |
| Fuel Oil #2 | $30,000 | 6,000 |
MMBtu
|
$5.00 |
| Other Energy | $30,000 | 6,000 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | $101,359 | |||
| RECOMMENDED SAVINGS* | $5,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $904 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $1,781 | $100 |
$1,781
15,356
kWh
|
- | |
| 02 | 2.8123: Pay utility bills on time | $373 | - | - | $373 | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $229 | $25 |
$229
1,977
kWh
|
- | |
| 04 | 2.7134: Use photocell controls | $1,096 | $250 |
$1,096
9,464
kWh
|
- | |
| 05 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $1,710 | $495 |
$1,710
14,759
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $44 | $41 |
$44
378
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $531 | $10,000 |
$531
4,586
kWh
|
- | |
| TOTAL RECOMMENDED | $5,764 | $10,911 |
$5,391
46,520
kWh
|
$373 | ||
| TOTAL IMPLEMENTED | $904 | $10,000 |
$531
4,586
kWh
|
$373 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs