ITAC Assessment: LS1909
ITAC logo
ITAC Assessment: LS1909
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Shrimp Processing Equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 223
Plant Area 124,173
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,991 4,772,200
kWh
TOTAL YEARLY COSTS $358,991
RECOMMENDED SAVINGS* $8,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $442 $25 $442
5,879
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,322 $1,222 $4,322
57,460
kWh
03 2.2135: Repair and eliminate steam leaks $2,121 $585 $2,121
28,192
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $980 $320 $980
13,033
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $447 $300 $447
5,938
kWh
06 2.7447: Install vinyl strip / high speed / air curtain doors $651 $635 $651
8,654
kWh
TOTAL RECOMMENDED $8,963 $3,087 $8,963
119,156
kWh
TOTAL IMPLEMENTED $6,443 $1,807 $6,443
85,652
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs