ITAC Assessment: LS1822
ITAC logo
ITAC Assessment: LS1822
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Hotel
NAICS 721110: Hotels (except Casino Hotels) and Motels
SIC 7011: Hotels and Motels
Sales Range less than $500
k
# of Employees 31
Plant Area 23,450
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,343 835,400
kWh
Electricity Demand $25,092 2,896
kW-mo/yr
Natural Gas $10,218 999
MMBtu
TOTAL YEARLY COSTS $107,653
RECOMMENDED SAVINGS* $39,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7423: Reduce heat gain by window tinting $30,799 $2,056 $30,799
354,012
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $2,555 $1,292 - $2,555
-
MMBtu
03 2.7442: Keep doors and windows shut when not on use $190 $125 $190
2,189
kWh
-
04 2.7135: Install occupancy sensors $49 $50 $49
568
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $6,150 $23,430 $6,150
70,690
kWh
-
TOTAL RECOMMENDED $39,743 $26,953 $37,188
427,459
kWh
$2,555
-
MMBtu
TOTAL IMPLEMENTED $36,998 $25,536 $36,998
425,270
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs