Assessment Year | 2018 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
32,000
ft2
|
Annual Production | 310
Tgal
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $20,884 | 269,640 |
kWh
|
$0.077 | |
Electricity Demand | $3,329 | 808 |
kW-mo/yr
|
$4.12 | |
Natural Gas | $9,745 | 1,412 |
MMBtu
|
$6.90 | |
LPG | $32,000 | 6,400 |
MMBtu
|
$5.00 | |
Fuel Oil #2 | $25,000 | 5,000 |
MMBtu
|
$5.00 | |
Other Energy | $5,000 | 1,000 |
MMBtu
|
$5.00 | |
Waste Disposal Costs | |||||
Water Usage | $9,821 | 1,105 |
Tgal
|
$8.89 | |
TOTAL YEARLY COSTS | $105,779 | ||||
RECOMMENDED SAVINGS* | $3,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $3,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $459 | $25 | - | - | $459 | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,369 | $350 |
$1,369
18,503
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $73 | $25 |
$73
977
kWh
|
- | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $146 | $125 |
$146
1,965
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $15 | $100 |
$15
200
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,427 | $3,000 |
$1,158
15,558
kWh
|
$269
-
kW-mo/yr
|
- | |
07 | 2.7134: Use photocell controls | $88 | $225 |
$88
1,190
kWh
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $261 | $788 |
$261
3,510
kWh
|
- | - | |
TOTAL RECOMMENDED | $3,838 | $4,638 |
$3,110
41,903
kWh
|
$269
-
kW-mo/yr
|
$459 | ||
TOTAL IMPLEMENTED | $3,489 | $3,625 |
$2,761
37,203
kWh
|
$269
-
kW-mo/yr
|
$459 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs