ITAC Assessment: LS1810
ITAC logo
ITAC Assessment: LS1810
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 310
Tgal
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,845 375,384
kWh
Electricity Demand $6,366 950
kW-mo/yr
Electricity Fees $16,000 -
Natural Gas $16,742 2,069
MMBtu
LPG $10,000 2,000
MMBtu
Other Gas $10,000 2,000
MMBtu
Other Energy $5,000 1,000
MMBtu
Waste Disposal Costs
Water Usage $16,060 1,313
Tgal
TOTAL YEARLY COSTS $117,013
RECOMMENDED SAVINGS* $3,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $358 $25 $358
3,651
kWh
- -
02 2.2136: Install / repair insulation on steam lines $880 $340 - - $880
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $650 $650 $650
6,784
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $986 $1,088 $825
8,416
kWh
$161
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $37 $55 $37
374
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $764 $1,800 $764
7,787
kWh
- -
TOTAL RECOMMENDED $3,675 $3,958 $2,634
27,012
kWh
$161
-
kW-mo/yr
$880
-
MMBtu
TOTAL IMPLEMENTED $2,630 $3,228 $1,589
16,203
kWh
$161
-
kW-mo/yr
$880
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs