| Assessment Year | 2018 |
|---|---|
| Principal Product | Processed meats |
| NAICS | 311612: Meat Processed from Carcasses |
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $1 M to 5M |
| # of Employees | 22 |
| Plant Area |
33,000
ft2
|
| Annual Production | 13,730,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $72,768 | 850,080 |
kWh
|
$0.086 | |
| Electricity Demand | $17,616 | 1,992 |
kW-mo/yr
|
$8.84 | |
| Natural Gas | $9,937 | 1,202 |
MMBtu
|
$8.27 | |
| Waste Disposal Costs | |||||
| Water Usage | $9,167 | 536 |
Tgal
|
$17.09 | |
| TOTAL YEARLY COSTS | $109,488 | ||||
| RECOMMENDED SAVINGS* | $13,069 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,090 | $100 | - |
$1,090
-
kW-mo/yr
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $134 | $45 |
$134
1,560
kWh
|
- | - | |
| 03 | 2.7135: Install occupancy sensors | $401 | $300 |
$401
4,659
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,902 | $4,019 |
$3,097
36,017
kWh
|
$1,805
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $364 | $440 | - | - |
$364
-
MMBtu
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $33 | $50 |
$33
391
kWh
|
- | - | |
| 07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $6,145 | $11,000 | - | - |
$6,145
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,069 | $15,954 |
$3,665
42,627
kWh
|
$2,895
-
kW-mo/yr
|
$6,509
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs