ITAC Assessment: LS1808
ITAC logo
ITAC Assessment: LS1808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Market Printing, Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 28,000
ft2
Annual Production 12,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,356 281,200
kWh
Natural Gas $2,000 300
MMBtu
Other Gas $5,000 167
MMBtu
Other Energy $17,998 834
MMBtu
Waste Disposal Costs
Water Usage $260 83
Tgal
Water Disposal $625 83
Tgal
Solid Waste (non-haz) $10,200 10,400
lb
TOTAL YEARLY COSTS $66,439
RECOMMENDED SAVINGS* $18,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $530 $340 $530
4,814
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $516 - $516
4,694
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $52 - $52
473
kWh
04 2.9114: Use solar heat to make electricty $17,694 $232,925 $17,694
160,864
kWh
TOTAL RECOMMENDED $18,792 $233,265 $18,792
170,845
kWh
TOTAL IMPLEMENTED $1,098 $340 $1,098
9,981
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs