ITAC Assessment: LS1622
ITAC logo
ITAC Assessment: LS1622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Offices
NAICS 541330: Engineering Services
SIC 8748: Business Consulting Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 10
Plant Area 47,797
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,852 113,969
kWh
Natural Gas $3,021 208
MMBtu
TOTAL YEARLY COSTS $16,873
RECOMMENDED SAVINGS* $12,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $3,718 $350 $3,718
30,472
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $3,014 $1,496 - $3,014
-
MMBtu
03 2.7135: Install occupancy sensors $250 $200 $250
2,060
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,928 $6,120 $5,928
48,594
kWh
-
TOTAL RECOMMENDED $12,910 $8,166 $9,896
81,126
kWh
$3,014
-
MMBtu
TOTAL IMPLEMENTED $9,646 $6,470 $9,646
79,066
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs