ITAC Assessment: LS1522
ITAC logo
ITAC Assessment: LS1522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Offices
NAICS 541330: Engineering Services
SIC 8748: Business Consulting Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 10
Plant Area 216,720
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $768,137 7,433,850
kWh
Electricity Demand $88,992 22,250
kW-mo/yr
Natural Gas $26,472 2,625
MMBtu
TOTAL YEARLY COSTS $883,601
RECOMMENDED SAVINGS* $97,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,981

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $59,902 $3,750 $59,902
581,569
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $32,079 $33,425 $27,463
226,630
kWh
$4,616
-
kW-mo/yr
03 2.7135: Install occupancy sensors $3,599 $4,375 $3,599
34,944
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $702 $1,050 $702
6,811
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $872 $4,215 $872
8,465
kWh
-
TOTAL RECOMMENDED $97,154 $46,815 $92,538
858,419
kWh
$4,616
-
kW-mo/yr
TOTAL IMPLEMENTED $91,981 $37,175 $87,365
808,199
kWh
$4,616
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs