Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Structural steel fabrication
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $100
M
to 500
M
# of Employees 165
Plant Area 304,920
ft2
Annual Production 24,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,802 4,347,011
kWh
Electricity Demand $104,073 12,264
kW-mo/yr
Electricity Fees $1,620 -
Natural Gas $127,098 31,118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.423: Move product using mechanical means $5,006 $9,000 n/a - - - - $5,006 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,180 $2,828 n/a $1,432
48,066
kWh
$748
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $2,129 - n/a - - - - - $2,129
04 2.7135: Install occupancy sensors $783 $1,188 n/a $783
29,601
kWh
- - - - -
05 2.1321: Replace fossil fuel equipment with electrical equipment $1,226 $5,610 n/a - - $1,226
-
MMBtu
- - -
06 4.423: Move product using mechanical means $6,531 - n/a - - - $6,531
-
lb
- -
TOTAL RECOMMENDED $17,855 $18,626 $2,215
77,667
kWh
$748
-
kW-mo/yr
$1,226
-
MMBtu
$6,531
-
lb
$5,006 $2,129
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs