ITAC Assessment: LS1222
ITAC logo
ITAC Assessment: LS1222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Office and Warehousing
NAICS 493110: General Warehousing and Storage
SIC 4226: Special Warehousing and Storage, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 200
Plant Area 650,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,087 4,112,216
kWh
TOTAL YEARLY COSTS $398,087
RECOMMENDED SAVINGS* $66,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2625: Chill water to the highest temperature possible $1,670 - $1,670
17,256
kWh
- - -
02 3.5315: Lease / purchase baler; sell cardboard to recycler $2,620 - - - $2,620 -
03 2.7261: Install timers and/or thermostats $6,112 $150 $6,112
63,135
kWh
- - -
04 2.7134: Use photocell controls $3,053 $222 $3,053
31,536
kWh
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $19,500 $11,480 - $19,500 - -
06 4.661: Level zero – install control systems for existing equipment $6,500 $4,700 - - $6,500 -
07 2.7135: Install occupancy sensors $243 $200 $243
2,513
kWh
- - -
08 3.8314: Purchase high materials in returnable bulk containers $3,575 $6,000 - - - $3,575
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,449 $6,202 $3,449
35,625
kWh
- - -
10 2.7425: Clean or color roof to reduce solar load $19,500 $43,350 - $19,500 - -
TOTAL RECOMMENDED $66,222 $72,304 $14,527
150,065
kWh
$39,000 $9,120 $3,575
TOTAL IMPLEMENTED $11,035 $6,624 $8,415
86,930
kWh
- $2,620 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs