ITAC Assessment: LS0423
ITAC logo
ITAC Assessment: LS0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Elementary School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 50
Plant Area 53,500
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,780 389,460
kWh
Electricity Demand $8,360 2,029
kW-mo/yr
TOTAL YEARLY COSTS $45,140
RECOMMENDED SAVINGS* $24,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,187

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2625: Chill water to the highest temperature possible $2,341 - $2,341
24,909
kWh
-
02 2.7261: Install timers and/or thermostats $16,263 $1,100 $16,263
173,012
kWh
-
03 2.7134: Use photocell controls $225 $111 $225
2,391
kWh
-
04 2.7211: Clean and maintain refrigerant condensers and towers $325 $189 $325
3,460
kWh
-
05 2.7135: Install occupancy sensors $1,678 $1,350 $1,678
17,851
kWh
-
06 2.2511: Insulate bare equipment $207 $220 $207
2,204
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,246 $5,876 $2,607
27,737
kWh
$639
-
kW-mo/yr
TOTAL RECOMMENDED $24,285 $8,846 $23,646
251,564
kWh
$639
-
kW-mo/yr
TOTAL IMPLEMENTED $21,187 $8,326 $20,548
218,600
kWh
$639
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs