ITAC Assessment: LS0323
ITAC logo
ITAC Assessment: LS0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Elementary School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 30
Plant Area 40,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,479 570,800
kWh
Electricity Demand $10,803 2,622
kW-mo/yr
TOTAL YEARLY COSTS $62,282
RECOMMENDED SAVINGS* $8,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $968 $150 $968
10,752
kWh
-
02 2.7135: Install occupancy sensors $444 $250 $444
4,927
kWh
-
03 2.2222: Convert liquid heaters from underfiring to immersion or submersion heating $3,384 $2,100 $3,384
37,592
kWh
-
04 2.7442: Keep doors and windows shut when not on use $159 $150 $159
1,758
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,354 $8,296 $2,666
29,624
kWh
$688
-
kW-mo/yr
TOTAL RECOMMENDED $8,309 $10,946 $7,621
84,653
kWh
$688
-
kW-mo/yr
TOTAL IMPLEMENTED $4,925 $8,846 $4,237
47,061
kWh
$688
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs