ITAC Assessment: LS0005
ITAC logo
ITAC Assessment: LS0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Amines
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 107
Plant Area 2,861,032
ft2
Annual Production 285,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,390,190 31,867,600
kWh
Electricity Demand $432,228 56,208
kW-mo/yr
Natural Gas $2,486,844 746,800
MMBtu
TOTAL YEARLY COSTS $4,309,262
RECOMMENDED SAVINGS* $256,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $69,401 $106,209 - - $69,401 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,903 $21,300 $25,903
637,858
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,795 $4,000 $4,795
118,075
kWh
- - -
04 2.6218: Turn off equipment when not in use $7,832 $100 - - - $7,832
-
MMBtu
05 2.1223: Install smaller boiler (increase high fire duty cycle) $134,326 $621,739 - - - $134,326
-
MMBtu
06 2.7425: Clean or color roof to reduce solar load $7,044 $34,056 $7,044
176,090
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,997 $3,280 $5,635
140,883
kWh
$1,362
-
kW-mo/yr
- -
08 2.7261: Install timers and/or thermostats $330 $400 $330
8,238
kWh
- - -
09 2.7135: Install occupancy sensors $347 $585 $347
8,665
kWh
- - -
TOTAL RECOMMENDED $256,975 $791,669 $44,054
1,089,809
kWh
$1,362
-
kW-mo/yr
$69,401 $142,158
-
MMBtu
TOTAL IMPLEMENTED $46,204 $29,665 $37,010
913,719
kWh
$1,362
-
kW-mo/yr
- $7,832
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs