ITAC Assessment: LM0108
ITAC logo
ITAC Assessment: LM0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product frozen meals
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 51,000
ft2
Annual Production 600
ton
Production Hrs. Annual 4,572
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,133 2,479,037
kWh
Electricity Demand $98,347 6,008
kW-mo/yr
Electricity Fees $31,395 -
Natural Gas $31,033 3,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $539,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $487,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7425: Clean or color roof to reduce solar load $42,160 $64,000 $18,883
259,811
kWh
$23,277
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $9,822 - - $9,822
-
kW-mo/yr
- -
03 4.432: Cross-train personnel to avoid lost time $287,197 - $37,597
495,807
kWh
- $249,600 -
04 4.311: Schedule deliveries according to demand $16,460 - $2,657
35,040
kWh
$7,858
-
kW-mo/yr
- $5,945
05 4.432: Cross-train personnel to avoid lost time $184,119 $15,120 $9,399
123,952
kWh
- $174,720 -
TOTAL RECOMMENDED $539,758 $79,120 $68,536
914,610
kWh
$40,957
-
kW-mo/yr
$424,320 $5,945
TOTAL IMPLEMENTED $487,776 $15,120 $49,653
654,799
kWh
$7,858
-
kW-mo/yr
$424,320 $5,945
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs