ITAC Assessment: LM0096
ITAC logo
ITAC Assessment: LM0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 111,250
ft2
Annual Production 50,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $474,717 9,216,640
kWh
Electricity Demand $275,196 18,859
kW-mo/yr
Electricity Fees $98,660 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $561,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,931

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,099 $1,300 $5,363
49,122
kWh
$736
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $5,434 $350 $5,434
104,900
kWh
- -
03 2.7233: Use properly designed and sized hvac equipment $91,510 $125,000 $41,270
796,700
kWh
$50,240
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $364 $400 $247
3,764
kWh
$117
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $493 $532 $271
5,226
kWh
$222
-
kW-mo/yr
-
06 2.7124: Make a practice of turning off lights when not needed $4,034 $90 $2,108
40,700
kWh
$1,926
-
kW-mo/yr
-
07 4.431: Train operators for maximum operating efficiency $262,500 $71,250 - - $262,500
08 4.625: Develop standard operating procedures $140,625 $10,800 - - $140,625
09 4.611: Begin a practice of predictive / preventative maintenance $46,875 $2,000 - - $46,875
10 4.431: Train operators for maximum operating efficiency $3,250 $1,125 - - $3,250
TOTAL RECOMMENDED $561,184 $212,847 $54,693
1,000,412
kWh
$53,241
-
kW-mo/yr
$453,250
TOTAL IMPLEMENTED $15,931 $2,140 $13,152
198,486
kWh
$2,779
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs