Assessment Year | 2005 |
---|---|
Principal Product | capacitors |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675: Electronic Capacitors |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
111,250
ft2
|
Annual Production | 50,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $474,717 | 9,216,640 |
kWh
|
$0.052 |
Electricity Demand | $275,196 | 18,859 |
kW-mo/yr
|
$14.59 |
Electricity Fees | $98,660 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $561,184 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,099 | $1,300 |
$5,363
49,122
kWh
|
$736
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $5,434 | $350 |
$5,434
104,900
kWh
|
- | - | |
03 | 2.7233: Use properly designed and sized hvac equipment | $91,510 | $125,000 |
$41,270
796,700
kWh
|
$50,240
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $364 | $400 |
$247
3,764
kWh
|
$117
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $493 | $532 |
$271
5,226
kWh
|
$222
-
kW-mo/yr
|
- | |
06 | 2.7124: Make a practice of turning off lights when not needed | $4,034 | $90 |
$2,108
40,700
kWh
|
$1,926
-
kW-mo/yr
|
- | |
07 | 4.431: Train operators for maximum operating efficiency | $262,500 | $71,250 | - | - | $262,500 | |
08 | 4.625: Develop standard operating procedures | $140,625 | $10,800 | - | - | $140,625 | |
09 | 4.611: Begin a practice of predictive / preventative maintenance | $46,875 | $2,000 | - | - | $46,875 | |
10 | 4.431: Train operators for maximum operating efficiency | $3,250 | $1,125 | - | - | $3,250 | |
TOTAL RECOMMENDED | $561,184 | $212,847 |
$54,693
1,000,412
kWh
|
$53,241
-
kW-mo/yr
|
$453,250 | ||
TOTAL IMPLEMENTED | $15,931 | $2,140 |
$13,152
198,486
kWh
|
$2,779
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs