ITAC Assessment: LM0093
ITAC logo
ITAC Assessment: LM0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product PVC cement
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 4,576
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,116 2,002,199
kWh
Electricity Demand $66,319 629
kW-mo/yr
Electricity Fees $11,065 -
Natural Gas $1,070 88
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,607

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,607 $475 $1,316
12,768
kWh
$291
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,940 - $1,591
15,440
kWh
$349
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $903 $200 $740
7,178
kWh
$163
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $1,570 $150 $1,441
13,985
kWh
$129
-
kW-mo/yr
-
05 4.426: Modify workload $32,448 $300 - - $32,448
TOTAL RECOMMENDED $38,468 $1,125 $5,088
49,371
kWh
$932
-
kW-mo/yr
$32,448
TOTAL IMPLEMENTED $1,607 $475 $1,316
12,768
kWh
$291
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs