ITAC Assessment: LM0090
ITAC logo
ITAC Assessment: LM0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product thread rolling
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 39
Plant Area 29,000
ft2
Annual Production 261,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,265 351,360
kWh
Electricity Demand $28,693 2,321
kW-mo/yr
Electricity Fees $6,750 -
Natural Gas $3,143 305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.4226: Use / purchase optimum sized compressor $1,633 - $770
27,281
kWh
$863
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $429 $280 $202
3,436
kWh
$227
-
kW-mo/yr
- - - -
03 3.6192: Use a less expensive method of waste removal $2,100 - - - - $2,100 - -
04 4.625: Develop standard operating procedures $2,898 $2,000 $(-477.0)
(-8,127)
kWh
- - - - $3,375
05 4.122: Develop standard procedures to improve internal yields $45,000 $32,440 - - - - $45,000 -
06 4.624: Hire additional personnel to reduce changeout time $24,485 $2,000 $(-4,127.0)
(-70,272)
kWh
$(-6,388.0)
-
kW-mo/yr
$(-70,000.0) - - $105,000
07 2.7145: Install skylights $2,790 $7,500 $2,179
37,089
kWh
$611
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $79,335 $44,220 $(-1,453.0)
(-10,593)
kWh
$(-4,687.0)
-
kW-mo/yr
$(-70,000.0) $2,100 $45,000 $108,375
TOTAL IMPLEMENTED $429 $280 $202
3,436
kWh
$227
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs