ITAC Assessment: LM0059
ITAC logo
ITAC Assessment: LM0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product asphalt saturated kraft
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 48,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 8,184
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,140 1,420,200
kWh
Electricity Demand $26,024 2,592
kW-mo/yr
Electricity Fees $3,595 -
Natural Gas $48,026 10,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,711,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $634 $310 $361
5,508
kWh
$273
-
kW-mo/yr
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $298 $120 $242
3,682
kWh
$56
-
kW-mo/yr
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $402 $150 $326
4,977
kWh
$76
-
kW-mo/yr
- - - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $245 $145 $199
3,046
kWh
$46
-
kW-mo/yr
- - - - - -
05 2.2414: Use waste heat from hot flue gases to preheat $4,308 $5,000 - - $4,308
-
MMBtu
- - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,238 $11,000 - - - $10,890
-
lb
- $(-2,652.0) - -
07 4.111: Add equipment/ operators to reduce production bottleneck $5,160,984 $1,000,000 - - - - - - - $5,160,984
08 4.445: Install equipment to move product $17,902 $10,000 - - - - $17,902 - - -
09 4.652: Replace existing equipment with more suitable substitutes $1,518,000 $250,000 - - - - - - $1,518,000 -
TOTAL RECOMMENDED $6,711,011 $1,276,725 $1,128
17,213
kWh
$451
-
kW-mo/yr
$4,308
-
MMBtu
$10,890
-
lb
$17,902 $(-2,652.0) $1,518,000 $5,160,984
TOTAL IMPLEMENTED $18,200 $10,120 $242
3,682
kWh
$56
-
kW-mo/yr
- - $17,902 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs