Assessment Year | 2003 |
---|---|
Principal Product | asphalt saturated kraft |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
48,000
ft2
|
Annual Production | 15,000
ton
|
Production Hrs. Annual | 8,184
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,140 | 1,420,200 |
kWh
|
$0.063 |
Electricity Demand | $26,024 | 2,592 |
kW-mo/yr
|
$10.04 |
Electricity Fees | $3,595 | - |
|
- |
Natural Gas | $48,026 | 10,800 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,711,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $634 | $310 |
$361
5,508
kWh
|
$273
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $298 | $120 |
$242
3,682
kWh
|
$56
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $402 | $150 |
$326
4,977
kWh
|
$76
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $245 | $145 |
$199
3,046
kWh
|
$46
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,308 | $5,000 | - | - |
$4,308
-
MMBtu
|
- | - | - | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,238 | $11,000 | - | - | - |
$10,890
-
lb
|
- | $(-2,652.0) | - | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,160,984 | $1,000,000 | - | - | - | - | - | - | - | $5,160,984 | |
08 | 4.445: Install equipment to move product | $17,902 | $10,000 | - | - | - | - | $17,902 | - | - | - | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $1,518,000 | $250,000 | - | - | - | - | - | - | $1,518,000 | - | |
TOTAL RECOMMENDED | $6,711,011 | $1,276,725 |
$1,128
17,213
kWh
|
$451
-
kW-mo/yr
|
$4,308
-
MMBtu
|
$10,890
-
lb
|
$17,902 | $(-2,652.0) | $1,518,000 | $5,160,984 | ||
TOTAL IMPLEMENTED | $18,200 | $10,120 |
$242
3,682
kWh
|
$56
-
kW-mo/yr
|
- | - | $17,902 | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs