ITAC Assessment: LM0054
ITAC logo
ITAC Assessment: LM0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product fasteners
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 130,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,083 3,307,328
kWh
Electricity Demand $118,723 9,180
kW-mo/yr
Electricity Fees $4,840 -
Natural Gas $31,914 6,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $2,854 $1,545 $2,386
21,185
kWh
$468
-
kW-mo/yr
- -
02 2.7124: Make a practice of turning off lights when not needed $5,770 - $3,235
28,669
kWh
$2,535
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,079 $410 $1,232
10,957
kWh
$367
-
kW-mo/yr
- $(-520.0)
04 2.4221: Install compressor air intakes in coolest locations $3,410 $1,000 $2,852
25,303
kWh
$558
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $346 - $289
2,563
kWh
$57
-
kW-mo/yr
- -
06 2.2514: Cover open tanks $3,464 $420 $2,896
25,695
kWh
$568
-
kW-mo/yr
- -
07 2.2414: Use waste heat from hot flue gases to preheat $2,472 $4,000 - - $2,472
-
MMBtu
-
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $316 $400 $264
2,339
kWh
$52
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,711 $7,775 $13,154
116,711
kWh
$4,605
-
kW-mo/yr
$2,472
-
MMBtu
$(-520.0)
TOTAL IMPLEMENTED $17,239 $3,775 $13,154
116,711
kWh
$4,605
-
kW-mo/yr
- $(-520.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs