Assessment Year | 2000 |
---|---|
Principal Product | Retail Store Fixtures |
NAICS |
n/a
|
SIC | 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers |
Sales Range | $10 M to 50M |
# of Employees | 103 |
Plant Area |
70,000
ft2
|
Annual Production | 7,200,000
lb
|
Production Hrs. Annual | 4,186
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,693 | 929,953 |
kWh
|
$0.047 |
Electricity Demand | $26,398 | 2,889 |
kW-mo/yr
|
$9.14 |
Electricity Fees | $3,311 | - |
|
- |
Natural Gas | $24,295 | 2,866 |
MMBtu
|
$8.48 |
LPG | $6,567 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,582 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,466 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $952 | $4,794 |
$524
11,137
kWh
|
$428
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,239 | $144 |
$1,026
21,981
kWh
|
$573
-
kW-mo/yr
|
- | - | $640 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $642 | $1,500 |
$412
8,792
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $513 | - |
$513
10,844
kWh
|
- | - | - | - | |
05 | 2.6218: Turn off equipment when not in use | $437 | - |
$437
9,379
kWh
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,732 | $1,400 |
$1,732
36,928
kWh
|
- | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,692 | $400 |
$1,692
36,049
kWh
|
- | - | - | - | |
08 | 2.7229: Air condition only space necessary | $5,049 | $300 | - | - |
$5,049
-
MMBtu
|
- | - | |
09 | 4.632: Change operating conditions | $7,193 | $20,000 | - | - | - | - | $7,193 | |
10 | 4.445: Install equipment to move product | $2,400 | $2,600 | - | - | - | - | $2,400 | |
11 | 4.431: Train operators for maximum operating efficiency | $4,200 | - | - | - | - | - | $4,200 | |
12 | 4.632: Change operating conditions | $1,260 | $200 | - | - | - | - | $1,260 | |
13 | 3.1175: Use a different or recycled raw material | $1,273 | - | - | - | - |
$1,273
-
lb
|
- | |
TOTAL RECOMMENDED | $29,582 | $31,338 |
$6,336
135,110
kWh
|
$1,231
-
kW-mo/yr
|
$5,049
-
MMBtu
|
$1,273
-
lb
|
$15,693 | ||
TOTAL IMPLEMENTED | $17,466 | $5,000 |
$3,054
65,064
kWh
|
$230
-
kW-mo/yr
|
$5,049
-
MMBtu
|
$1,273
-
lb
|
$7,860 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs