Assessment Year | 2003 |
---|---|
Principal Product | steel containers |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 80 |
Plant Area |
50,000
ft2
|
Annual Production | 1,075
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,598 | 387,560 |
kWh
|
$0.063 |
Electricity Demand | $25,050 | 2,496 |
kW-mo/yr
|
$10.04 |
Electricity Fees | $(-61.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $252,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,832 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $199 | - |
$199
3,041
kWh
|
- | - | |
02 | 2.7124: Make a practice of turning off lights when not needed | $3,113 | - |
$1,772
27,060
kWh
|
$1,341
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,671 | $2,725 |
$951
14,518
kWh
|
$720
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $143 | $100 |
$81
1,242
kWh
|
$62
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $520 | - |
$296
4,522
kWh
|
$224
-
kW-mo/yr
|
- | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $120,656 | $39,410 | n/a | - | - | $120,656 |
07 | 4.731: Advertise product or service | $126,133 | $2,000 | - | - | $126,133 | |
TOTAL RECOMMENDED | $252,435 | $44,235 |
$3,299
50,383
kWh
|
$2,347
-
kW-mo/yr
|
$246,789 | ||
TOTAL IMPLEMENTED | $3,832 | - |
$2,267
34,623
kWh
|
$1,565
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs