ITAC Assessment: LM0052
ITAC logo
ITAC Assessment: LM0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product steel containers
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 50,000
ft2
Annual Production 1,075
pieces
Production Hrs. Annual 2,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,598 387,560
kWh
Electricity Demand $25,050 2,496
kW-mo/yr
Electricity Fees $(-61.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $199 - $199
3,041
kWh
- -
02 2.7124: Make a practice of turning off lights when not needed $3,113 - $1,772
27,060
kWh
$1,341
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,671 $2,725 $951
14,518
kWh
$720
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $143 $100 $81
1,242
kWh
$62
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $520 - $296
4,522
kWh
$224
-
kW-mo/yr
-
06 4.513: Re-arrange equipment layout to reduce labor costs $120,656 $39,410 n/a - - $120,656
07 4.731: Advertise product or service $126,133 $2,000 - - $126,133
TOTAL RECOMMENDED $252,435 $44,235 $3,299
50,383
kWh
$2,347
-
kW-mo/yr
$246,789
TOTAL IMPLEMENTED $3,832 - $2,267
34,623
kWh
$1,565
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs