ITAC Assessment: LM0042
ITAC logo
ITAC Assessment: LM0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 192,000
ft2
Annual Production 800,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,050 4,457,228
kWh
Electricity Demand $141,910 11,004
kW-mo/yr
Electricity Fees $(-173,338.0) -
Natural Gas $87,492 37,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.4133: Use most efficient type of electric motors $646 $193 $525
4,723
kWh
$121
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,591 $438 $1,342
12,073
kWh
$249
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $899 $169 $729
6,564
kWh
$170
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $713 $806 - - $713
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $84,270 $45,600 $68,412
615,600
kWh
$15,858
-
kW-mo/yr
- -
06 4.111: Add equipment/ operators to reduce production bottleneck $44,755 $30,000 - - - $44,755
TOTAL RECOMMENDED $132,874 $77,206 $71,008
638,960
kWh
$16,398
-
kW-mo/yr
$713
-
MMBtu
$44,755
TOTAL IMPLEMENTED $2,950 $1,437 $1,867
16,796
kWh
$370
-
kW-mo/yr
$713
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings