ITAC Assessment: IA0439
ITAC logo
ITAC Assessment: IA0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Moldings
NAICS 337212: Custom Architectural Woodwork and Millwork Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 165,500
ft2
Annual Production 5,800,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,437 4,159,134
kWh
Electricity Demand $185,354 24,972
kW-mo/yr
Natural Gas $13,684 1,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $662 $1,585 $353
8,259
kWh
$309
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,322 $41,595 $8,388
196
kWh
$7,934
-
kW-mo/yr
03 2.7135: Install occupancy sensors $461 $359 $461
10,836
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $741 $469 $381
8,999
kWh
$360
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,905 $81 $979
22,984
kWh
$926
-
kW-mo/yr
06 2.4221: Install compressor air intakes in coolest locations $1,196 $689 $596
13,931
kWh
$600
-
kW-mo/yr
TOTAL RECOMMENDED $21,287 $44,778 $11,158
65,205
kWh
$10,129
-
kW-mo/yr
TOTAL IMPLEMENTED $3,308 $2,135 $1,713
40,242
kWh
$1,595
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs