ITAC Assessment: LM0040
ITAC logo
ITAC Assessment: LM0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product iron pipe fittings
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,440
ft2
Annual Production 5,428,665
lb
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,878 2,055,357
kWh
Electricity Demand $69,859 8,748
kW-mo/yr
Electricity Fees $25,327 -
Natural Gas $45,689 8,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,685 $450 $2,855
27,000
kWh
$610
-
kW-mo/yr
- $(-780.0) - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,048 $600 $1,484
14,040
kWh
$564
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,476 $288 $1,240
11,737
kWh
$236
-
kW-mo/yr
- - - -
04 2.7124: Make a practice of turning off lights when not needed $2,360 $1,440 $1,586
15,004
kWh
$774
-
kW-mo/yr
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $4,888 $9,000 - - $4,888
-
MMBtu
- - -
06 4.121: Maintain clean conditions before painting $108,300 $200 - - - - $108,300 -
07 4.132: Purchase new equipment to reduce material use / cost $45,250 $1,332 - - - - - $45,250
08 4.513: Re-arrange equipment layout to reduce labor costs $13,000 $3,900 - - - $13,000 - -
TOTAL RECOMMENDED $180,007 $17,210 $7,165
67,781
kWh
$2,184
-
kW-mo/yr
$4,888
-
MMBtu
$12,220 $108,300 $45,250
TOTAL IMPLEMENTED $1,476 $288 $1,240
11,737
kWh
$236
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs