ITAC Assessment: LM0026
ITAC logo
ITAC Assessment: LM0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 166
Plant Area 100,000
ft2
Annual Production 2,300,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $444,811 5,373,576
kWh
Electricity Demand $158,235 35,076
kW-mo/yr
Electricity Fees $29,735 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,166 $1,152 $1,758
15,506
kWh
$408
-
kW-mo/yr
- -
02 2.7145: Install skylights $6,152 $4,400 $5,012
37,222
kWh
$1,140
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $36,384 $900 $30,071
265,244
kWh
$7,093
-
kW-mo/yr
$(-780.0) -
04 2.4221: Install compressor air intakes in coolest locations $494 $250 $400
3,531
kWh
$94
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,396 - $3,558
31,385
kWh
$838
-
kW-mo/yr
- -
06 4.321: Optimize production lot sizes and inventories $66,667 - - - - $66,667
07 4.625: Develop standard operating procedures $63,050 $12,200 - - $63,050 -
TOTAL RECOMMENDED $179,309 $18,902 $40,799
352,888
kWh
$9,573
-
kW-mo/yr
$62,270 $66,667
TOTAL IMPLEMENTED $49,592 $6,702 $40,799
352,888
kWh
$9,573
-
kW-mo/yr
$(-780.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs