ITAC Assessment: LM0021
ITAC logo
ITAC Assessment: LM0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product fabric
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $50
M
to 100
M
# of Employees 370
Plant Area 217,000
ft2
Annual Production 78,000
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $630,311 12,206,636
kWh
Electricity Demand $298,736 86,496
kW-mo/yr
Electricity Fees $208,109 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $292,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,082 $857 $1,746
18,477
kWh
$336
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $40,680 $48,707 $28,253
307,316
kWh
$12,427
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $2,649 $6,000 $2,005
12,150
kWh
$644
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,054 $400 $24,830
277,124
kWh
$5,006
-
kW-mo/yr
$(-782.0) -
05 2.4221: Install compressor air intakes in coolest locations $2,216 $228 $1,844
20,575
kWh
$372
-
kW-mo/yr
- -
06 2.4237: Substitute compressed air cooling with water or air cooling $12,450 $250 $10,254
114,813
kWh
$2,196
-
kW-mo/yr
- -
07 4.122: Develop standard procedures to improve internal yields $203,861 $40,400 - - - $203,861
TOTAL RECOMMENDED $292,992 $96,842 $68,932
750,455
kWh
$20,981
-
kW-mo/yr
$(-782.0) $203,861
TOTAL IMPLEMENTED $74,465 $55,964 $56,834
615,067
kWh
$18,413
-
kW-mo/yr
$(-782.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs