Assessment Year | 2001 |
---|---|
Principal Product | fabric |
NAICS |
n/a
|
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $50 M to 100M |
# of Employees | 370 |
Plant Area |
217,000
ft2
|
Annual Production | 78,000
thousand feet
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $630,311 | 12,206,636 |
kWh
|
$0.052 |
Electricity Demand | $298,736 | 86,496 |
kW-mo/yr
|
$3.45 |
Electricity Fees | $208,109 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $292,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,465 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,082 | $857 |
$1,746
18,477
kWh
|
$336
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,680 | $48,707 |
$28,253
307,316
kWh
|
$12,427
-
kW-mo/yr
|
- | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $2,649 | $6,000 |
$2,005
12,150
kWh
|
$644
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,054 | $400 |
$24,830
277,124
kWh
|
$5,006
-
kW-mo/yr
|
$(-782.0) | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,216 | $228 |
$1,844
20,575
kWh
|
$372
-
kW-mo/yr
|
- | - | |
06 | 2.4237: Substitute compressed air cooling with water or air cooling | $12,450 | $250 |
$10,254
114,813
kWh
|
$2,196
-
kW-mo/yr
|
- | - | |
07 | 4.122: Develop standard procedures to improve internal yields | $203,861 | $40,400 | - | - | - | $203,861 | |
TOTAL RECOMMENDED | $292,992 | $96,842 |
$68,932
750,455
kWh
|
$20,981
-
kW-mo/yr
|
$(-782.0) | $203,861 | ||
TOTAL IMPLEMENTED | $74,465 | $55,964 |
$56,834
615,067
kWh
|
$18,413
-
kW-mo/yr
|
$(-782.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs