| Assessment Year | 2001 |
|---|---|
| Principal Product | aerospace metal ducts |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 370 |
| Plant Area |
125,000
ft2
|
| Annual Production | 163,285
pieces
|
| Production Hrs. Annual | 5,246
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $121,926 | 2,395,744 |
kWh
|
$0.051 |
| Electricity Demand | $89,195 | 17,046 |
kW-mo/yr
|
$5.23 |
| Electricity Fees | $97,955 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,386,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,000,982 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,365 | $300 |
$2,620
23,169
kWh
|
$525
-
kW-mo/yr
|
$(-780.0) | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,880 | $164 |
$2,398
21,184
kWh
|
$482
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.3134: Shift from daytime to nighttime operation | $48,865 | $450 |
$23,218
205,000
kWh
|
$52,647
-
kW-mo/yr
|
$(-27,000.0) | - | - | |
| 04 | 4.122: Develop standard procedures to improve internal yields | $409,752 | $26,000 | - | - | - | $409,752 | - | |
| 05 | 4.625: Develop standard operating procedures | $540,000 | $11,000 | - | - | - | - | $540,000 | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $382,500 | $6,000 | - | - | $382,500 | - | - | |
| TOTAL RECOMMENDED | $1,386,362 | $43,914 |
$28,236
249,353
kWh
|
$53,654
-
kW-mo/yr
|
$354,720 | $409,752 | $540,000 | ||
| TOTAL IMPLEMENTED | $1,000,982 | $37,750 |
$25,838
228,169
kWh
|
$53,172
-
kW-mo/yr
|
$(-27,780.0) | $409,752 | $540,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs