ITAC Assessment: LM0017
ITAC logo
ITAC Assessment: LM0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product aerospace metal ducts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 370
Plant Area 125,000
ft2
Annual Production 163,285
pieces
Production Hrs. Annual 5,246
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,926 2,395,744
kWh
Electricity Demand $89,195 17,046
kW-mo/yr
Electricity Fees $97,955 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,386,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,000,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,365 $300 $2,620
23,169
kWh
$525
-
kW-mo/yr
$(-780.0) - -
02 2.4221: Install compressor air intakes in coolest locations $2,880 $164 $2,398
21,184
kWh
$482
-
kW-mo/yr
- - -
03 2.3134: Shift from daytime to nighttime operation $48,865 $450 $23,218
205,000
kWh
$52,647
-
kW-mo/yr
$(-27,000.0) - -
04 4.122: Develop standard procedures to improve internal yields $409,752 $26,000 - - - $409,752 -
05 4.625: Develop standard operating procedures $540,000 $11,000 - - - - $540,000
06 4.111: Add equipment/ operators to reduce production bottleneck $382,500 $6,000 - - $382,500 - -
TOTAL RECOMMENDED $1,386,362 $43,914 $28,236
249,353
kWh
$53,654
-
kW-mo/yr
$354,720 $409,752 $540,000
TOTAL IMPLEMENTED $1,000,982 $37,750 $25,838
228,169
kWh
$53,172
-
kW-mo/yr
$(-27,780.0) $409,752 $540,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs