ITAC Assessment: LM0014
ITAC logo
ITAC Assessment: LM0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product ball valves & fire hydrants
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 46,954
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,524 5,212,064
kWh
Electricity Demand $181,010 34,572
kW-mo/yr
Electricity Fees $47,842 -
Natural Gas $19,711 3,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $149 $145 n/a $149
1,299
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,545 $250 n/a $1,246
10,883
kWh
$299
-
kW-mo/yr
- - -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $189 $300 n/a $189
1,610
kWh
- - - -
04 2.6218: Turn off equipment when not in use $4,883 $263 n/a $4,219
28,774
kWh
$664
-
kW-mo/yr
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,820 $12,500 n/a - - - $10,820 -
06 4.126: Install sensors to detect defects $22,000 $2,800 n/a - - - - $22,000
07 4.322: Eliminate old stock and modify inventory control $8,000 $1,000 n/a - - - $8,000 -
08 2.3134: Shift from daytime to nighttime operation $131,040 $36,250 n/a - - $131,040 - -
TOTAL RECOMMENDED $178,626 $53,508 $5,803
42,566
kWh
$963
-
kW-mo/yr
$131,040 $18,820 $22,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs