Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Concrete Pipe
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 350
thousand feet
Production Hrs. Annual 5,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,330 1,851,358
kWh
Natural Gas $45,510 5,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,211

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $13,551 $1,457 - $13,551 -
02 2.7224: Reduce space conditioning during non-working hours $13,537 $450 $13,537
210,000
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,760 $1,600 $6,760
104,878
kWh
- -
04 2.7134: Use photocell controls $4,851 $210 $4,851
75,256
kWh
- -
05 4.611: Begin a practice of predictive / preventative maintenance $4,310 $420 $2,810
33,821
kWh
- $1,500
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,383 $8 $1,383
21,459
kWh
- -
07 2.7135: Install occupancy sensors $895 $1,080 $895
13,877
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $466 $315 $193
3,996
kWh
$164 $110
09 2.7111: Reduce illumination to minimum necessary levels $356 $425 $356
5,528
kWh
- -
10 2.6211: Conserve energy by efficient use of vending machines $225 $312 $225
3,494
kWh
- -
TOTAL RECOMMENDED $46,334 $6,277 $31,010
472,309
kWh
$13,715 $1,610
TOTAL IMPLEMENTED $31,211 $4,120 $16,160
240,942
kWh
$13,551 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs