ITAC Assessment: LL0327
ITAC logo
ITAC Assessment: LL0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Premium threading and tubular accessories
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 17
Plant Area 43,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,698 1,097,800
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,425 $4,180 $6,425
88,503
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,725 $30 $2,725
37,539
kWh
03 2.7111: Reduce illumination to minimum necessary levels $531 $390 $531
7,319
kWh
04 2.7135: Install occupancy sensors $245 $390 $245
3,379
kWh
05 2.6211: Conserve energy by efficient use of vending machines $127 $160 $127
1,748
kWh
TOTAL RECOMMENDED $10,053 $5,150 $10,053
138,488
kWh
TOTAL IMPLEMENTED $9,150 $4,210 $9,150
126,042
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs