ITAC Assessment: LL0298
ITAC logo
ITAC Assessment: LL0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Milled Rice
NAICS 311212: Rice Milling
SIC 2044: Rice Milling
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 400,000
ft2
Annual Production 45,000
ton
Production Hrs. Annual 2,500
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,473 3,924,000
kWh
Electricity Demand $122,912 14,424
kW-mo/yr
Electricity Fees $13,213 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,940 $27,500 $6,718
95,011
kWh
- $222 -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $3,587 $152 $3,472
49,105
kWh
- $115 -
03 2.7224: Reduce space conditioning during non-working hours $1,972 $240 $1,909
27,000
kWh
- $63 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $582 $350 $235
3,329
kWh
$43
-
kW-mo/yr
- $304
05 2.6211: Conserve energy by efficient use of vending machines $256 $319 $248
3,504
kWh
- $8 -
06 2.7135: Install occupancy sensors $223 $420 $216
3,052
kWh
- $7 -
TOTAL RECOMMENDED $13,560 $28,981 $12,798
181,001
kWh
$43
-
kW-mo/yr
$415 $304
TOTAL IMPLEMENTED $5,559 $392 $5,381
76,105
kWh
- $178 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs