ITAC Assessment: UD0024
ITAC logo
ITAC Assessment: UD0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AIRCRAFT PROPELLERS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 28,500
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,655 3,435,815
kWh
Natural Gas $24,038 7,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $611 $350 - $611
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,472 - $1,472
29,894
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,200 $1,000 $7,200
-
kWh
-
TOTAL RECOMMENDED $9,283 $1,350 $8,672
29,894
kWh
$611
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs