Assessment Year | 1999 |
---|---|
Principal Product | Thermoformed plastics |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
70,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,322 | 1,518,171 |
kWh
|
$0.059 |
Electricity Demand | $35,700 | 6,060 |
kW-mo/yr
|
$5.89 |
Electricity Fees | $14,212 | - |
|
- |
Natural Gas | $10,534 | 1,870 |
MMBtu
|
$5.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,968 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,894 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $75,618 | $250,000 |
$55,447
873,681
kWh
|
$36,677
-
kW-mo/yr
|
$(-16,506.0)
-
MMBtu
|
|
02 | 2.7135: Install occupancy sensors | $1,042 | $1,000 |
$1,042
16,413
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,892 | $5,813 |
$5,301
83,529
kWh
|
$1,168
-
kW-mo/yr
|
$(-1,577.0)
-
MMBtu
|
|
04 | 2.2623: Minimize condenser cooling water temperature | $456 | $1,275 |
$456
7,327
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,423 | $5,216 |
$856
13,482
kWh
|
$567
-
kW-mo/yr
|
- | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $537 | - |
$294
4,689
kWh
|
$243
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $83,968 | $263,304 |
$63,396
999,121
kWh
|
$38,655
-
kW-mo/yr
|
$(-18,083.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,894 | $12,029 |
$7,493
118,113
kWh
|
$1,978
-
kW-mo/yr
|
$(-1,577.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs