ITAC Assessment: MA0450
ITAC logo
ITAC Assessment: MA0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Thermoformed plastics
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 70,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,322 1,518,171
kWh
Electricity Demand $35,700 6,060
kW-mo/yr
Electricity Fees $14,212 -
Natural Gas $10,534 1,870
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $75,618 $250,000 $55,447
873,681
kWh
$36,677
-
kW-mo/yr
$(-16,506.0)
-
MMBtu
02 2.7135: Install occupancy sensors $1,042 $1,000 $1,042
16,413
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,892 $5,813 $5,301
83,529
kWh
$1,168
-
kW-mo/yr
$(-1,577.0)
-
MMBtu
04 2.2623: Minimize condenser cooling water temperature $456 $1,275 $456
7,327
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,423 $5,216 $856
13,482
kWh
$567
-
kW-mo/yr
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $537 - $294
4,689
kWh
$243
-
kW-mo/yr
-
TOTAL RECOMMENDED $83,968 $263,304 $63,396
999,121
kWh
$38,655
-
kW-mo/yr
$(-18,083.0)
-
MMBtu
TOTAL IMPLEMENTED $7,894 $12,029 $7,493
118,113
kWh
$1,978
-
kW-mo/yr
$(-1,577.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs