ITAC Assessment: LL0187
ITAC logo
ITAC Assessment: LL0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2732: Book Printing
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area 44,000
ft2
Annual Production 52,195,827
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,324 1,920,204
kWh
Electricity Demand $32,479 5,446
kW-mo/yr
Electricity Fees $12,636 -
Natural Gas $16,966 1,983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,645

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $11,409 $135 $10,381
209,116
kWh
- $1,028 -
02 2.7111: Reduce illumination to minimum necessary levels $4,426 $1,560 $2,959
59,814
kWh
$1,067
-
kW-mo/yr
$400 -
03 2.6232: Install set-back timers $2,941 $18 $2,676
53,913
kWh
- $265 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,103 $30 $748
15,067
kWh
$256
-
kW-mo/yr
$99 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $870 $400 $792
15,962
kWh
- $78 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $273 $300 $248
4,993
kWh
- $25 -
07 2.7132: Install timers on light switches in little used areas $663 $96 $603
12,141
kWh
- $60 -
08 2.7135: Install occupancy sensors $167 $120 $152
3,065
kWh
- $15 -
09 4.611: Begin a practice of predictive / preventative maintenance $1,500 $60 - - - $1,500
TOTAL RECOMMENDED $23,352 $2,719 $18,559
374,071
kWh
$1,323
-
kW-mo/yr
$1,970 $1,500
TOTAL IMPLEMENTED $18,645 $2,575 $14,532
292,950
kWh
$1,067
-
kW-mo/yr
$1,546 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs