Assessment Year | 2004 |
---|---|
Principal Product | Valves |
NAICS | 332911: Industrial Valve Manufacturing |
SIC | 3491: Industrial Valves |
Sales Range | $50 M to 100M |
# of Employees | 288 |
Plant Area |
250,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $830,444 | 19,480,000 |
kWh
|
$0.043 |
Electricity Demand | $316,917 | 43,118 |
kW-mo/yr
|
$7.35 |
Electricity Fees | $43,600 | - |
|
- |
Natural Gas | $50,968 | 7,553 |
MMBtu
|
$6.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $418,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $191,795 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $172,411 | $79,000 |
$231,905
5,439,960
kWh
|
$54,772
-
kW-mo/yr
|
$6,196 |
$(-120,462.0)
-
MMBtu
|
- | |
02 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $54,044 | $325,479 |
$77,800
1,825,000
kWh
|
$44,100
-
kW-mo/yr
|
$(-17,338.0) |
$(-50,518.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,248 | $33,150 |
$32,980
773,641
kWh
|
$14,465
-
kW-mo/yr
|
$1,803 | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $35,377 | $500 | - |
$34,082
-
kW-mo/yr
|
$1,295 | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $35,354 | $60,000 | - |
$34,060
-
kW-mo/yr
|
$1,294 | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $30,593 | $12,360 |
$29,473
691,373
kWh
|
- | $1,120 | - | - | |
07 | 2.2511: Insulate bare equipment | $18,697 | $3,264 |
$18,013
422,641
kWh
|
- | $684 | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,036 | $74,480 |
$4,251
99,729
kWh
|
$3,491
-
kW-mo/yr
|
$294 | - | - | |
09 | 2.3137: Use power during off-peak periods | $7,577 | $8,004 |
$5,345
125,380
kWh
|
$1,955
-
kW-mo/yr
|
$277 | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,481 | $1,542 |
$2,332
54,698
kWh
|
$1,022
-
kW-mo/yr
|
$127 | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,164 | $1,680 |
$681
15,978
kWh
|
- | $26 | - | $1,457 | |
12 | 2.4133: Use most efficient type of electric motors | $1,268 | $9,300 |
$436
10,239
kWh
|
$786
-
kW-mo/yr
|
$46 | - | - | |
TOTAL RECOMMENDED | $418,250 | $608,759 |
$403,216
9,458,639
kWh
|
$188,733
-
kW-mo/yr
|
$(-4,176.0) |
$(-170,980.0)
-
MMBtu
|
$1,457 | ||
TOTAL IMPLEMENTED | $191,795 | $204,280 |
$93,511
2,193,679
kWh
|
$89,861
-
kW-mo/yr
|
$6,966 | - | $1,457 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs