ITAC Assessment: LL0140
ITAC logo
ITAC Assessment: LL0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Oil field tools
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 85,690
ft2
Annual Production 207,284
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,677 2,495,365
kWh
Electricity Demand $39,700 7,307
kW-mo/yr
Electricity Fees $9,401 -
Natural Gas $46,301 5,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $12,791 $19,845 - $12,299
-
kW-mo/yr
$492 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,175 $525 $1,130
19,975
kWh
- $45 -
03 2.7111: Reduce illumination to minimum necessary levels $1,129 - $619
10,944
kWh
$467
-
kW-mo/yr
$43 -
04 2.7135: Install occupancy sensors $904 $520 $668
11,804
kWh
$201
-
kW-mo/yr
$35 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $772 $345 $742
13,113
kWh
- $30 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $296 $120 $285
5,039
kWh
- $11 -
07 2.8114: Change rate schedules or other changes in utility service $108 - - - - $108
TOTAL RECOMMENDED $17,175 $21,355 $3,444
60,875
kWh
$12,967
-
kW-mo/yr
$656 $108
TOTAL IMPLEMENTED $2,243 $990 $2,157
38,127
kWh
- $86 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs